Formalize the path-values boundary (Phase 7 Step 5)
Release Recommendation
Release: ship independently
Phase 7 Step 5 is tagged Release: independent in the architecture roadmap, and the Release batches subsection lists it as "independently releasable (a decision / docs change)."
It is not a member of the symlink-resistant-path-matching batch (Steps 1–3, already shipped).
This is a docs-and-clarity change with one lint-config addition — it carries a docs: commit, which auto-batches into the next release; the ADR and the roadmap completion mark are the deliverables, not a behavior change that forces a release.
Problem Statement
After Phase 7 Steps 1–2 (#502, #503), the resolver is the sole producer of the path-values AccessIntent variant: every path gate emits access-path (carrying an AccessPath), and the resolver unwraps it via matchValues() into a string-based path-values intent before the manager evaluates rules.
The roadmap's #487 vision listed "collapse the path-values variant" as a goal, but the residual variant is not transitional scaffolding — it is the seam between the path-aware resolver and the deliberately string-based manager.
Whether to formalize that seam or collapse it (moving the matchValues() unwrap into the manager, which would then import AccessPath) is a genuine design decision, resolved here as an explicit choice rather than a pre-committed mechanical change.
The decision: formalize.
Keep path-values as the manager's intentional string boundary, document why, and add a durability guard so the invariant cannot silently erode.
Goals
- Record the formalize decision as an ADR (
docs/decisions/0002-path-values-string-boundary.md), following the0001format. - Tighten the JSDoc on
access-intent.ts,permission-resolver.ts, andpermission-manager.tsto name the boundary invariant as a contract and point to the ADR. - Add an ESLint
no-restricted-importsguard scoped topermission-manager.tsforbidding an import fromaccess-intent/access-path, mirroring the existingno-restricted-syntaxprocess.platformguard — so collapsing the boundary requires an explicit, reviewed lint exception. - Mark Phase 7 Step 5 complete in
docs/architecture/architecture.md(step heading ✅, Mermaid node ✅, metric row, residual-handling bullet) in the same commit as the work. - Delete the scratch tour file (
docs/0506-path-values-boundary-tour.md) once the ADR supersedes it.
This change is non-breaking — no runtime behavior changes, no public type changes, no config changes.
Non-Goals
- Collapsing the
path-valuesvariant. Explicitly rejected by this decision; recorded as the rejected alternative in the ADR. - Changing
AccessPath, the resolver'stoResolvedIntent, or the manager'scheck()runtime logic. Only their doc comments change. - Touching historical plans/retros that mention
path-values(docs/plans/05xx,docs/retro/05xx). They are point-in-time records, not living docs. - Config-pattern / prompt-input
AccessPathmigration and principal-identity work. Already out of Phase 7 scope per the roadmap Non-goals.
Background
Relevant modules and the role each plays in the boundary:
src/access-intent/access-intent.ts— declares the two unions.AccessIntent = ToolAccessIntent | AccessPathAccessIntent(gate-facing) andResolvedAccessIntent = ToolAccessIntent | PathValuesAccessIntent(manager-facing).AccessPathAccessIntentlegitimately importsAccessPath(the gate-facing variant carries the value object);PathValuesAccessIntentcarries onlyreadonly string[].src/permission-resolver.ts—toResolvedIntentis the only function that convertsaccess-path→path-values, callingpath.matchValues()exactly once (the Tell-Don't-Ask unwrap site).src/permission-manager.ts—check(intent: ResolvedAccessIntent)evaluates(surface, string[])against the ruleset and has zero imports fromaccess-intent/access-path(line 250 is a JSDoc mention, not an import).eslint.config.js— already carries api-permission-system/src-scopedno-restricted-syntaxrule (forbidding interiorprocess.platform, #510); the new guard follows that pattern as a per-fileno-restricted-importsoverride.docs/decisions/0001-project-trust-adoption.md— the sole existing ADR; supplies the frontmatter (status,date) and section format (## Status,## Context,## Decision,## Alternatives considered).
Constraints from AGENTS.md / SKILL.md that apply:
- The architecture roadmap marker (
✅on heading + Mermaid node + stale metric rows) lands in the implementation commit, not a deferred ship commit (#479, #480). - A
docs:commit is ahidden: truechangelog type that auto-batches; the Release Recommendation must not claim it cuts a release on its own. docs/architecture/architecture.mduses reference-style issue links;[#506]already has a definition — do not re-add it.
Design Overview
This is a documentation-and-guard change; the only code touched is doc comments plus one ESLint rule.
The decision model is captured in the tour (docs/0506-path-values-boundary-tour.md) and distilled into the ADR.
The boundary, stated as a contract
The invariant being formalized, in three parts:
- The resolver is the sole
matchValues()unwrap site (toResolvedIntent), so the lexical ∪ canonical alias set (#418) is derived once, centrally. - The manager is string-based:
check()consumesResolvedAccessIntent(tool | path-values) and never importsAccessPath. - Path-awareness flows downward and stops at the resolver — the manager is a leaf with no
access-intent/access-pathdependency.
Why formalize (not collapse)
- Single responsibility.
The manager evaluates
(surface, string[])against a ruleset — a complete, testable contract with no path semantics. Collapsing grows the engine a second concern (path representation) it currently delegates away. - Tell-Don't-Ask wash.
Collapse does not remove the
matchValues()ask; it relocates the single unwrap one layer deeper, into the busier string-matching engine. - Dependency direction.
Collapse widens the manager (a leaf) with an
AccessPathimport to save one nominal type (PathValuesAccessIntent) and one converter — removing a real seam for a nominal gain.
The design introduces no new collaborator and no new call site; it preserves the existing narrow ResolvedAccessIntent interface (ISP — the manager reads surface + values, nothing path-shaped).
ESLint guard shape
A new flat-config object scoped to the single manager file, parallel to the process.platform guard:
{
files: ["packages/pi-permission-system/src/permission-manager.ts"],
rules: {
"no-restricted-imports": [
"error",
{
patterns: [
{
group: ["**/access-intent/access-path", "#src/access-intent/access-path"],
message:
"permission-manager stays string-based: it consumes ResolvedAccessIntent (path-values) and must not import AccessPath. See docs/decisions/0002.",
},
],
},
],
},
}
The manager currently has no such import, so the rule passes immediately on introduction; it fails only if a future change reintroduces the dependency (i.e. a collapse without an explicit exception).
ADR shape
docs/decisions/0002-path-values-string-boundary.md, frontmatter status: accepted + date, then:
- Status — Accepted.
- Context — the three actors, the post-Steps-1–2 sole-producer state, the type split (
AccessIntentvsResolvedAccessIntent), distilled from the tour. - Decision — formalize: keep
path-values, name the string-boundary invariant, add the lint guard. - Consequences — non-breaking; the manager stays a string leaf; the lint guard pins the invariant.
- Alternatives considered — collapse (moving
matchValues()into the manager): rejected, with the SRP / TDA-wash / dependency-direction rationale.
Module-Level Changes
docs/decisions/0002-path-values-string-boundary.md— new ADR (per the shape above).src/access-intent/access-intent.ts— tighten thePathValuesAccessIntentandResolvedAccessIntentJSDoc to name the boundary invariant and reference ADR-0002; no type or runtime change.src/permission-resolver.ts— tighten thetoResolvedIntent/resolveJSDoc to name "solematchValues()unwrap site" as a contract and reference ADR-0002.src/permission-manager.ts— tighten thecheck()JSDoc (around line 245–252) to state the manager stays string-based by design and reference ADR-0002; no logic change.eslint.config.js— add theno-restricted-importsguard object scoped topermission-manager.ts.docs/architecture/architecture.md— mark Phase 7 Step 5 complete:✅on the "5. Decide and formalize thepath-valuesboundary" heading and theS5Mermaid node label; update the metric row "Emitted/internal path-value forms" target to reflect the resolved/documented outcome; update the residualpath-valuesbullet ("survives as the manager's deliberate string boundary") to point to ADR-0002..pi/skills/package-pi-permission-system/SKILL.md— light touch on line 154: append that the resolver-internalpath-valuesboundary is now formalized as a deliberate seam (ADR-0002); the existing description is already accurate, so this is a one-clause pointer, not a rewrite.docs/0506-path-values-boundary-tour.md— delete (the scratch tour is superseded by the ADR).
No src/ export is removed or renamed; no README command/feature changes; no schema/config/example changes.
The path-values symbol survives unchanged, so the architecture's rule.ts inline-type listing is unaffected.
Test Impact Analysis
This change adds no test cycles.
- New tests enabled: none — formalizing a boundary via docs + a lint rule introduces no new unit-testable behavior.
The ESLint guard is verified by
pnpm run lint, not a vitest case. - Tests made redundant: none.
- Tests that must stay as-is: the existing resolver and manager tests (
test/permission-resolver.test.ts,test/permission-manager.test.ts, composition-root wiring) genuinely exercise the unwrap and the string-based evaluation; JSDoc changes do not touch them, and they remain the behavioral pins for the boundary.
Invariants at risk
This change touches surfaces that prior Phase 6/7 steps refactored; it must not regress their documented outcomes.
- #478 — "the resolver exposes a single
resolve(intent)entry point" / one unwrap site. Pinned by the type system (onlytoResolvedIntentconverts) andtest/permission-resolver.test.ts. Unchanged here (docs only). - #486 / #502 / #503 — "every path gate emits
access-path; the resolver unwraps viamatchValues()to lexical ∪ canonical." Pinned by the resolver/manager/gate tests. Unchanged here. - New invariant pinned by this change — "the manager never imports
AccessPath." Previously enforced by convention only; now pinned deterministically by theno-restricted-importslint guard (verified in CI viapnpm run lint).
No green-suite regression of an earlier step's outcome is possible: the runtime is untouched and the new guard only tightens.
Build Order
This is a docs/config plan (no red→green test cycles); /build-plan executes it.
Suggested step order and commit shape:
- Write the ADR
docs/decisions/0002-path-values-string-boundary.mdand delete the scratch tour file. Verify: ADR renders, links resolve,pnpm run lintclean on markdown. Commit:docs(pi-permission-system): record path-values string-boundary decision (ADR-0002) (#506). - Tighten the JSDoc in
access-intent.ts,permission-resolver.ts,permission-manager.ts, and add theeslint.config.jsno-restricted-importsguard. Verify:pnpm run checkandpnpm run lintclean (the guard passes — the manager has noaccess-pathimport). Commit:docs(pi-permission-system): name the path-values boundary contract and guard it (#506). - Mark Phase 7 Step 5 complete in
architecture.md(heading + Mermaid node + metric row + residual bullet) and add the SKILL.md ADR pointer. Verify:mmdcparses the step diagram;pnpm run lintclean. Commit:docs(pi-permission-system): mark Phase 7 Step 5 complete (#506).
Steps 1–3 may also be squashed into a single docs: commit if preferred — the work is small and cohesive.
Run pnpm run check, pnpm run lint, pnpm -r run test, and pnpm fallow dead-code before completion regardless.
Risks and Mitigations
- Risk: the lint guard pattern misses an import form (relative vs
#src/alias). Mitigation: thegrouparray lists both the#src/access-intent/access-pathalias and the**/access-intent/access-pathrelative/glob form; eslint enforces#src/aliases over relative paths package-wide, so the alias form is the realistic vector, but both are covered. - Risk: the architecture metric row or Mermaid node is left stale (the #479/#480 split-marker trap). Mitigation: the completion marks land in Step 3's commit alongside the work, not at ship; the pre-completion reviewer checks roadmap-marker freshness.
- Risk: deleting the tour file loses the decision rationale. Mitigation: the rationale is migrated verbatim into the ADR's Context / Alternatives sections before deletion.
Open Questions
None. The decision (formalize) and the documentation vehicle (ADR-0002 + tightened inline docs) were confirmed with the operator during planning. No follow-up issues are warranted — this completes Phase 7 Step 5 and, with Steps 1–4 already shipped, closes Phase 7.