issue, issue_title
issue issue_title
506 pi-permission-system: decide and formalize the path-values boundary (Phase 7 Step 5)

Retro: #506 — Formalize the path-values boundary (Phase 7 Step 5)

Stage: Planning (2026-06-30T00:00:00Z)

Session summary

Planned Phase 7 Step 5 — the deliberate decision on the resolver-internal path-values AccessIntent variant. The operator requested a code tour before deciding; produced docs/0506-path-values-boundary-tour.md (scratch) tracing the gate → resolver → manager flow and reading "what the system wants," then confirmed formalize (keep the string boundary) with an ADR-0002 + tightened inline docs vehicle via ask_user. The plan is docs + JSDoc + one ESLint no-restricted-imports guard; non-breaking, ships independently, and closes Phase 7.

Observations

  • The decision was strongly pre-indicated by the code: the resolver's Tell-Don't-Ask JSDoc, the architecture's "deliberate string boundary" residual note, and Step 2's explicit "the premise Step 5 decides against" all point to formalize. The operator still wanted the tour to verify the grain rather than take the lean on faith.
  • Chose an ESLint no-restricted-imports guard scoped to permission-manager.ts over a vitest source-introspection test — it mirrors the existing process.platform no-restricted-syntax guard (#510), is CI-gated by pnpm run lint, and keeps this a /build-plan (no red→green cycles).
  • The new durable invariant the guard pins: "the manager never imports AccessPath." Previously convention-only; collapse would now require an explicit, reviewed lint exception.
  • Routed to /build-plan, not /tdd-plan: the only code change is doc comments + one lint rule; the runtime is untouched.
  • Rejected collapse rationale (recorded for the ADR): SRP (manager stays a string engine), Tell-Don't-Ask wash (unwrap just moves one layer deeper), dependency direction (widening a leaf to save one nominal type + converter).
  • Doc-update surface: architecture.md (Step 5 completion marks + metric row + residual bullet), SKILL.md line 154 (one-clause ADR pointer), three src JSDoc files. Historical docs/plans/05xx and docs/retro/05xx that mention path-values are point-in-time records — left untouched.
  • The scratch tour file is deliberately uncommitted; the plan's Step 1 deletes it once the ADR supersedes its rationale.
  • Release marker: **Release:** ship independentlydocs: commit auto-batches; the Release Recommendation explicitly avoids claiming it cuts a release on its own (Refs #479).

Stage: Implementation — Build (2026-06-30T14:00:00Z)

Session summary

Executed all three plan steps as docs/config changes: wrote ADR decisions/0002 (formalize decision + rejected collapse alternative), tightened the JSDoc on access-intent.ts / permission-resolver.ts / permission-manager.ts, added the no-restricted-imports ESLint guard on permission-manager.ts, and marked Phase 7 Step 5 complete in architecture.md (heading, S5 Mermaid node, metric row, residual bullet) plus a SKILL.md pointer. Four commits total (three plan steps + one reviewer-WARN fixup); non-breaking, runtime untouched, 2194 tests green.

Observations

  • Verified the ESLint guard actually fires before trusting it: temporarily added an AccessPath import to permission-manager.ts, confirmed eslint flagged no-restricted-imports, then reverted — avoids a false-green guard, which was the whole point of the durability mechanism.
  • The scratch tour file was never committed in planning, so "delete" was just an rm of an untracked file (no git rm).
  • Pre-completion reviewer returned WARN (no blocking failures), two findings, both addressed in commit cef7cccf:
    • WARN 1: the two metric rows for Steps 13 achievements (Lexical-only path normalizers, Symlink-resistant path surfaces) had never been marked by the issues that shipped those steps; with Phase 7 now closed there is no later issue to add them, so I added the marks now.
    • WARN 2: both SKILL.md and architecture.md already define [ADR-0002] as a reference link to pi-subagents' ADR (cross-package context), so this package's plain-text "ADR-0002" collided nominally; disambiguated by referencing the local ADR by its path (docs/decisions/0002-path-values-string-boundary.md) instead of the bare token.
  • Lesson for future package ADRs: the NNNN numbering is per-package, but reference-link tokens like [ADR-0002] are file-scoped and already taken by cross-package citations — refer to a local ADR by path, not a bare ADR-NNNN token, in any doc that also cites another package's ADR.
  • Phase 7 is now fully closed (Steps 15 all ); the heading carries (complete) matching Phase 6's convention. Did not archive the Phase 7 detail to a history/ file (Phase 6 was condensed when complete) — that was out of this plan's scope; flag as a possible follow-up tidy if the roadmap section grows unwieldy.

Stage: Final Retrospective (2026-06-30T16:00:00Z)

Session summary

One continuous session carried #506 through plan → build → ship → retro: a decide-and-document issue (Phase 7 Step 5) that formalized the resolver-internal path-values string boundary via ADR-0002, tightened JSDoc, and added a no-restricted-imports lint guard. Shipped cleanly as pi-permission-system-v18.0.1 (patch), closing #506 and the stacked #505, and completing Phase 7. Execution was notably clean — no rework loops, no instruction violations, two reviewer WARNs both resolved in one follow-up commit.

Observations

What went well

  • Guard-fires-before-trust verification. The whole point of the no-restricted-imports guard is to catch a future erosion of the string boundary, so before committing it the build stage temporarily added an AccessPath import to permission-manager.ts, confirmed eslint flagged it, then reverted. A false-green guard is worse than none; actively proving it fires is the correct validation for any "guard against future regression" mechanism.
  • Code-tour-before-deciding. For the genuine formalize-vs-collapse design choice, the operator asked for a walkthrough document first; the scratch tour (docs/0506-path-values-boundary-tour.md) traced the gate → resolver → manager flow, read "what the system wants," then folded verbatim into the ADR's Context/Alternatives and was deleted. The scratch-doc-that-becomes-the-ADR pattern kept the rationale durable without leaving a second artifact.
  • Incremental verification with no gaps. Baseline check/lint before any edit, lint after each build step, then full test (2194) + tsc + fallow dead-code at the end — verification was continuous, not end-loaded.

What caused friction (agent side)

  • missing-context — the plan's Module-Level Changes grepped for path-values references but did not anticipate two doc-hygiene items the pre-completion reviewer caught: the two Steps 13 metric rows still lacking at phase close, and the [ADR-0002] reference-link collision with pi-subagents' ADR. Impact: one follow-up commit (cef7cccf); no rework, both fixed cleanly. Reviewer-caught, not self-identified.
  • missing-context — used an invalid gh pr view --json mergeStateEstimate field during the ship stage (the field does not exist on the PR view schema). Impact: one wasted tool call, self-corrected on the next call with the valid mergeStateStatus. No rework.

What caused friction (user side)

  • None. The operator's one substantive intervention — requesting a code tour before the formalize-vs-collapse decision — was strategic and improved the outcome (it became the ADR's spine).

Diagnostic details

  • Model-performance correlation — the planning and build stages (judgment-heavy: the formalize-vs-collapse decision, the code tour, the design review) ran on claude-opus-4-8 / claude-sonnet-4-6; the pre-completion-reviewer subagent ran on its configured claude-sonnet-4-6 (appropriate for review). The entire /ship-issue stage ran on opencode-go/deepseek-v4-flash (an operator model switch). Ship is scripted but not purely mechanical — it carries the step-4b exclude-paths release analysis and the step-6.4 UNSTABLE-no-checks vs IN_PROGRESS-check distinction. The weak model executed both correctly (waited 6 poll cycles for the IN_PROGRESS check rather than falling back to gh pr merge prematurely, then merged via release_pr_merge), which suggests the ship prompt's determinism carried the reasoning. Flag, not alarm: a reasoning-weak model on the ship stage is a latent risk if the prompt's branch logic is ever less explicit than it is today.
  • Escalation-delay tracking — no rabbit-holes; longest repeated-call sequence was the legitimate 6-cycle CI-check poll (waiting, not error-chasing). The mergeStateEstimate field error self-corrected in one retry.
  • Feedback-loop gap analysis — no gap; verification was incremental (baseline → per-step lint → full suite + tsc + fallow at close), plus the active guard-fires check.

Changes made

  1. .pi/skills/markdown-conventions/SKILL.md — added a rule (after the file-scoped reference-definition bullet) that per-package ADR numbering collides with cross-package [ADR-NNNN] reference-link definitions; cite a local ADR by path, not a bare ADR-NNNN token (Refs #506).
  2. packages/pi-permission-system/docs/retro/0506-formalize-path-values-boundary.md — this Final Retrospective stage entry.